Published:2019-02-27 Author:
On December 8, 2018, the on-site assessment team of the National Mine Product Safety Mark Center conducted an on-site assessment of the production conditions and quality management system of the multi-stage centrifugal pump applied by our factory.The assessment team conducted the review based on the "General Requirements for Site Safety Assessment of Coal Mine Machinery Product Safety Marks", "Special Requirements for Site Evaluation of Centrifugal Pumps" and relevant standards for implementation.
After on-site verification and data review, the assessment team considered:The company's qualifications meet the requirements, the quality management system is complete and the operation is basically normal. The technical documents are consistent with the review and confirmation by the National Standards Center, and the operation guidance documents are complete; the production equipment and inspection equipment are complete; the technical power meets the production needs, and the inspection personnel are skilled in operation.The overall production conditions and quality management system meet the requirements of relevant assessment criteria, and have the production capacity of multi-stage centrifugal pumps in the assessment task book. Successfully passed the review.